Register electricity and gas units

Gültigkeitsgebiet: Bundesweit

Online erledigen

Quick info

If you operate an electricity or gas facility and it is connected to an electricity or gas grid, you must register the unit in the Federal Network Agency's Core Energy Market Data Register (MaStR). You only need to register planned facilities in certain cases.

Description

The Market Data Register (MaStR) serves as a central register for the energy transition and collects data on all generation facilities:

  • all new installations and all existing installations,
  • Plants for the generation of renewable and conventional energy,
  • Plants for the generation of electricity and gas.

If you operate a power or gas generation system (for example, a photovoltaic system, wind energy system, combined heat and power plant, battery storage system, or biomass system), you must register it with the MaStR. You are also required to register if no subsidies are granted or claimed for the electricity generated by the system.
All existing systems must be registered regardless of when they were commissioned – even if your system has been in operation for many years. This means that even if you have already registered your system at various other places, such as with your network operator or in previous registers of the Federal Network Agency, you must still enter these systems into MaStR again.
If an installation is shut down, you must also report this in the register. If the installation is not connected to a power or gas network, no notification is required.
In order for payments under the Renewable Energy Act (EEG) or the Combined Heat and Power Act (KWKG) to be paid without deductions, you must comply with the deadlines set by the legislator for registration.
You must submit the reports via the Federal Network Agency's online portal.
As citizens, you can also register through forms in exceptional cases.
Authorities can access the data of MaStR. This allows them to either significantly simplify their own surveys or completely eliminate them. Facility operators and other market players can refer to the data they entered into MaStR.

Procedure

If you wish to register yourself as a operator and your electricity and gas generation facilities in the MaStR, you can do so via the MaStR internet portal:

  • Visit the MaStR internet portal and first register as a user with a valid email address.
  • Log in to the MaStR internet portal and register as a facility operator.
  • Afterwards, you register your assets.
  • Upon successful registration, the system will provide you with your registration certificate containing your registration numbers (MaStR numbers).
  • You can make changes and corrections online at any time.

Deadlines

You must register within 1 month of the occurrence of an event that requires registration.

Costs & Fees

You don't have to pay anything.

Legal basis

further information

Technical approval

Federal Ministry for Economic Affairs and Energy

legal remedy

No legal remedy is provided.

Stichwörter

  • Energy supply
  • Wind energy
  • Energy transition
  • Renewable energies
  • EEG
  • Electricity
  • Photovoltaics
  • KWKG
  • Production facility
  • Power grid
  • Consumer facility
  • Gas
  • Master data
  • MaStR number
  • Gas network